Building Day 1: 4/18/18
- built frame of our design
- sawed of part of our base because it was too long for our design
- painted our design a relaxing blue color so the patients using this feel calm while working onn their skills
- built frame of our design
- sawed of part of our base because it was too long for our design
- painted our design a relaxing blue color so the patients using this feel calm while working onn their skills
Building Day 2: 4/19/18
- started to build part of the drum/lever
- made the rod that goes through the drum so it can move when the pedal is pressed down
- started to build part of the drum/lever
- made the rod that goes through the drum so it can move when the pedal is pressed down
Building Day 3: 4/23/18
- continued to work on pieces for the drum
- cut 2 pieces of wood to support the lever
Building Day 4/5: 4/27 - 4/30/18